Time-driven activity-based costing and room selling prices: A case study at The Sentra Hotel Manado

Authors

  • Kezia Brielni Wiltin Mewengkang Sam Ratulangi University
  • Agus Tony Poputra Sam Ratulangi University
  • Natalia Y. Telly Gerungai Sam Ratulangi University

DOI:

https://doi.org/10.58784/cfabr.491

Keywords:

time-driven activity-based costing, room pricing, cost-plus pricing, hotel costing

Abstract

Time-Driven Activity-Based Costing (TDABC) is a refinement of Activity-Based Costing that uses time as the primary cost driver, allocating resource costs to activities in proportion to the estimated minutes each activity actually consumes. This study aims to (1) determine room selling prices at The Sentra Hotel Manado, a four-star hotel in North Sulawesi, using the TDABC method, and (2) compare the resulting prices with those currently set by hotel management under a cost-plus/dynamic-pricing approach, for all six room types over the full 2025 operating year. The Sentra Hotel Manado was selected as the case on the basis of data accessibility, management's willingness to disclose detailed cost records, and its representativeness of North Sulawesi's growing four-star hotel segment; as a single-case design, the findings describe this property's cost structure and are not intended to generalize numerically to other hotels. A case-study approach was used, drawing on observation, semi-structured interviews, and documentation, with room-service activity times measured through direct stopwatch timing cross-checked against staff interviews and standard operating procedures. The results show that TDABC-based room prices are as follows: Superior at Rp625,667; Deluxe at Rp753,386; Premier at Rp929,546; Suite at Rp1,167,762; Premier Suite at Rp2,518,164; and President Suite at Rp5,572,733. Management's cost-plus/dynamic-pricing prices for the same room types are Rp650,300; Rp785,100; Rp987,870; Rp1,215,500; Rp2,560,000; and Rp5,685,000, respectively. TDABC-based prices are consistently lower than management's prices, by 1.6% to 5.9% depending on room type, because time-proportional allocation captures differences in service intensity across room types more precisely than management's single, uniform 70% margin. The findings support a resource-consumption rationale for time-based costing in hospitality: allocating shared service resources by actual activity time, rather than by an aggregate markup, more closely reflects each room type's true resource consumption.

Downloads

Download data is not yet available.

References

Ahmad, E., Puspandari, D. A., & Ambarriani, A.S. (2021). Analisis penghitungan biaya satuan (unit cost) tindakan poli gigi Klinik Pratama X menggunakan metode time driven activity based costing. Jurnal Manajemen Pelayanan Kesehatan, 23(1), 9-15. https://doi.org/10.22146/jmpk.v24i01.4060 DOI: https://doi.org/10.22146/jmpk.v24i01.4060

Amalia, V., Sadiyah, F. N., & Munambar, S. (2026). Implementasi time driven activity based costing (tdabc) dalam penetapan harga pokok produksi: Studi kasus PT ABCD. (2026). Jurnal Ilmiah Mahasiswa Agrokomplek, 5(2), 320-329. https://doi.org/10.29303/6g58k585 DOI: https://doi.org/10.29303/6g58k585

Amani, T., Hudzafidah, K., dan Wulandari, H. I. (2021). Utilization of the time driven activity based costing method in determining the cost of room rent at Hotel Tampiarto Probolinggo. International Journal of Social Science and Business, 5(4), 543-550.

https://doi.org/10.23887/ijssb.v5i4.40070 DOI: https://doi.org/10.23887/ijssb.v5i4.40070

Anita, N. (2021). Perkembangan ilmu akuntansi manajemen: Sebuah tinjauan literatur. Jurnal Paradigma: Jurnal Multidisipliner Mahasiswa Pascasarjana Indonesia, 2(2), 80-88. https://journal.ugm.ac.id/paradigma/article/view/70334

Badan Pusat Statistik Provinsi Sulawesi Utara. (2025). Jumlah Akomodasi, Kamar, dan Tempat Tidur yang Tersedia pada Hotel Bintang. Indonesia. https://sulut.bps.go.id/id/statisticstable/3/TjBWSldsWklZVnBXU1RKcVlsVTNSRXhpU2tzclFUMDkjMw==/jumlah-akomodasi--kamar--dan-tempat-tidur-yang-tersedia-pada-hotel-bintang-menurut-kabupaten-kota-di-provinsi-sulawesi-utara--2024.html?year=2023

Dunia, F. A., Abdullah, W., & Sasongko, C. (2021). Akuntansi biaya. Edisi 5. Salemba Empat

Hartono, E. (2021). Analisis cost to serve dan customer profitability dengan time-driven-activity based costing. JAK (Jurnal Akuntansi) Kajian Ilmiah Akuntansi, 8(1), 21-33. http://dx.doi.org/10.30656/jak.v8i1.2368 DOI: https://doi.org/10.30656/jak.v8i1.2368

Kotler, P, Amstrong, G. (2021). Principles of Marketing. Penerbit. Pearson education.

Mowen, M. M., Hansen, D. R., & Heitger, D. L. (2022). Managerial accounting: The cornerstone of business decision-making. Cengage Learning

Mulyadi. (2021). Akuntansi biaya. Edisi 5. UPP STIM YKPN.

Nugroho, B., & Wijayati, N. (2023). Implementasi time driven activity-based costing dan strategi harga pada agensi pemasaran digital kreatif. Jurnal Proaksi, 10(2), 125-142.

https://doi.org/10.32534/jpk.v10i2.3979 DOI: https://doi.org/10.32534/jpk.v10i2.3979

Putra, I. M. (2021). Akuntansi biaya pedoman terlengkap analisis dan pengendalian biaya produksi. Anak Hebat Indonesia

Suhendar. (2021). Pengantar akuntansi. Penerbit Adab.

Tjiptono, F. (2020). Strategi pemasaran, prinsip dan penerapan. Andi Offset.

Zahara, L., & Indayani. (2022). The time driven activity-based costing than hotel management methods for determining the cost of hotel room service (Case in The Grand Nanggroe Hotel Banda Aceh). Jurnal Akuntansi, 9(2), 250-266. http://doi.org/10.30656/Jak.V9i2.3105 DOI: https://doi.org/10.30656/jak.v9i2.3105

Downloads

Published

2026-09-05

How to Cite

Mewengkang, K. B. W., Poputra, A. T., & Gerungai, N. Y. T. (2026). Time-driven activity-based costing and room selling prices: A case study at The Sentra Hotel Manado. The Contrarian : Finance, Accounting, and Business Research, 5(2), 198–212. https://doi.org/10.58784/cfabr.491

Issue

Section

Articles